Hallenbad Hüslimatt - Oberwil

Swimming fun in a modern chrome-steel pool

After 30 years of operation, the Hüslimatt indoor pool no longer meets current standards. As a result, Steiner was given the job of completely overhauling its technical equipment. The wishes of users will be taken into account during execution, and the latest practices in pool engineering and operating safety will be applied.

 

A new 25-metre chrome-steel basin will be installed, with a modern control system to operate the technical equipment. Solar collectors will be mounted to heat the water and a fabric ceiling installed.

Facts and Figures

Name
Hallenbad Hüslimatt
Sector
Locality
Oberwil
Client
Gemeindeverwaltung Oberwil
Utilization
Special, Sport
Architect
Zwimpfer Partner AG
 
Show projects near you!